Home
About
Progress Photos and Maps
Street Closures
News
Contact Us
Back
Project Overview
Project Timeline
Meet Our Team
Street Improvement Drawings
Back
Renderings
Site A
Site C
Site D
Site E
Site F
Site O
Tunnel
Tunnel Excavation Status Map
Home
About
Project Overview
Project Timeline
Meet Our Team
Street Improvement Drawings
Progress Photos and Maps
Renderings
Site A
Site C
Site D
Site E
Site F
Site O
Tunnel
Tunnel Excavation Status Map
Street Closures
News
Contact Us
Site O - Hwy 352/Dixon Ave
February 2020
TBM Pushed into the Starter Tunnel
Gantry #1 lowered into Starter Tunnel
Looking down right side of TBM pushed up to Starter Tunnel Face
January 2020
Lowering TBM Rear Main Beam into Outfall Shaft 1
December 2019
TBM Assembled on the Surface
Dallas Mill Creek TBM Media Day
Lowering TBM Cutterhead Support
May 2019
Site O Aerial
Site O Aerial
Site O Aerial
Starter Tunnel Gripper Walls
Starter Tunnel Gripper Wall Left Side
Starter Tunnel Gripper Wall Right Side
Outfall Shaft
April 2019
Outfall Shaft & Tail Tunnel
Starter Tunnel - Gripper Walls
TBM Assembly - Gripper Carrier.
TBM Assembly
March 2019
Starter Tunnel Gripper Wall Footer Concrete
Starter Tunnel Gripper Wall Footer
Starter Tunnel
Tail Tunnel
TBM Assembly - Gantries
TBM Assembly - Gantry 4
TBM Assembly - Main Beam
TBM Assembly - Rear Beam Support
February 2019
Starter Tunnel
Starter Tunnel Excavation Complete at EL 286.5±
Starter Tunnel Excavation Complete at EL 286.5±
Looking Down Outfall Shaft 120.5-ft Down
Looking Into the Outfall Shaft
Looking Up Outfall Shaft from EL 286.5±
Looking Up Outfall Shaft from EL 286.5±
Starter Tunnel Excavation Third Bench
Starter Tunnel from Top of Third Bench Looking at Outfall Shaft
Tail Tunnel Excavation at STA 7+09±
Tail Tunnel Excavation at STA 7+46±
Tail Tunnel Excavation
TBM Assembly - Main Frame Bolted Together
TBM Assembly
TBM Outer Cutterhead Lower Support
TBM Vertical Front & Outer Cutterhead Lower Support
TBM Vertical Front & Outer Cutterhead Lower Support
TBM Vertical Front Support
TBM Vertical Front Support
TBM-Assembling Gantries #1 & #4
TBM-Assembling Gantries #1, 3 & 4
January 2019
Shaft Starter Tunnel Face at STA 10+72
Shaft Starter Tunnel Third Bench
Shaft Starter Tunnel Third Bench
Shaft Starter Tunnel Third Bench
Shaft Looking up Outfall Shaft 47 ft Diameter
Shaft Looking up Outfall Shaft 47 ft Diameter
Shaft Looking Down Outfall Shaft at Starter Tunnel Excavation
Shaft Looking Down Outfall Shaft at Starter Tunnel Excavation
Shaft E-Vibratory Hammer Driving Sheet Piles
September 2018
Rock Excavation below Concrete Collar
Outfall Shaft Rock Excavation
Outfall Shaft Looking Up
Drilling & Installing Split Sets and WWF Mesh
August 2018
Rock Excavation in the Outfall Shaft
Installation of Rock Bolts in Outfall Shaft.
Storm Drain Inlet No. 10 Installed on Barber Avenue
July 2018
Installation of 1st Ring Beam for Outfall Shaft SOE
Outfall Shaft Overburden Excavation
June 2018
Waterline Installation along Barber Avenue
Start of Outfall Shaft Liner Plate Support of Excavation
May 2018
Demolition of Northside of Barber Avenue
April 2018
Stripping Top Soil from Shaft O