Site D - N. Carroll Ave. / Victor St.
Buckner Park Area
Peaks Branch Intake – Intersection of North Carroll Avenue and Victor Street
Site D is one of the two Peak Branch intake sites and the site will have Shaft D (14.5-ft diameter & 165-ft deep) and a lateral connecting shaft to the main tunnel.
*Timeline: Site D
* Based on current Contractor Project Schedule.